国产一区二区三区不卡在线观看_国产成人手机高清在线观看网站_久久精品www人人做人人爽_毛片亚洲av无码精品国产午夜_国产在线视频一区二区三区

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

色欲一区二区三区精品a片| 亚洲精品天堂成人片av在线播放| 亚洲多毛妓女毛茸茸的| 强行交换配乱婬bd| 亚洲人精品午夜射精日韩| 女人被狂躁c到高潮喷水一区二区| 国产剧情av麻豆香蕉精品| 午夜dj高清免费观看视频| 欧美黑人又粗又硬xxxxx喷水| 国产伦精品一区二区三区妓女下载| 婷婷五月深爱综合开心网| 中国美女a级毛片| 男女超爽视频免费播放| 亚洲综合无码精品一区二区三区| 九九视频在线观看视频6| 亚洲色偷偷男人的天堂| 越南女子杂交内射bbwxz| 夜夜爽妓女8888视频免费观看| 日本特黄特黄刺激大片| 日本一卡二卡不卡视频查询| 国产伦精品免编号公布| 久久久久久夜精品精品免费啦| 色欲人妻综合网| 黑人粗硬进入过程视频| 蜜臀久久99精品久久久久久小说| 亚洲加勒比久久88色综合| 国产成人午夜不卡在线视频| 日本欧美久久久久免费播放网| 日本欧美一区二区免费视频| 性xxxx欧美老妇506070| 国产午夜精品一区理论片飘花| 成人无码视频| 极品人妻被黑人中出种子| 国产精品视频免费一区二区| 亚洲av无码专区在线厂| 青青草原综合久久大伊人精品| 好屌草这里只有精品| 被黑人伦流澡到高潮hnp动漫| 4399理论片午午伦夜理片| 午夜影视免费| 99久久久无码国产精品古装|