国产一区二区三区不卡在线观看_国产成人手机高清在线观看网站_久久精品www人人做人人爽_毛片亚洲av无码精品国产午夜_国产在线视频一区二区三区

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

高h喷水荡肉爽文np肉色学校| 在线播放五十路熟妇| 日本一本一区二区免费播放| 免费无码av一区二区| 国产内射性高湖| 国产成人av一区二区三区| 亚洲精华国产精华精华液网站| 亚洲国产精品无码久久98| 日日噜噜夜夜狠狠久久丁香五月| 人妻少妇熟女javhd| 香蕉人妻av久久久久天天| 日产区一线二线三av| 92国产精品午夜福利| 污污内射在线观看一区二区少妇| 中文字幕无码人妻aaa片| 精品久久久久久777米琪桃花| 成人乱人乱一区二区三区| 免费国产黄网站在线观看| 久久久久久a亚洲欧洲av冫| 国产亚洲精品久久久久久大师| 天天干成人网| 久久久久国产精品无码免费看| 狠狠人妻久久久久久综合| 国产乱码一区二区三区| 一本大道伊人av久久综合| 国精产品一区一区三区免费视频| 亚洲av色先锋资源电影网站| 亚洲av无码一区二区三区dv| 久久久久人妻啪啪一区二区| 久久av无码精品人妻系列试探| 国产做爰又粗又大又爽动漫| 又黄又爽又无遮挡免费的网站| 国产高跟黑色丝袜在线| 国产精品无码一区二区在线| 日本黄页网站免费观看| 国产精品久久精品第一页| 色综合久久网| 精品欧美乱码久久久久久1区2区| 国产婷婷色综合av蜜臀av| 欧美日韩亚洲精品瑜伽裤| 日本丰满少妇裸体自慰|